Roof Planning Capabilities

Competitive Bid Coordination

Structured bid management for Atlanta commercial roof replacements and major repairs - scope of work development, bid leveling, contractor vetting, and award recommendation with written.

Request this scope

Most Atlanta commercial roof bid processes produce three numbers that cannot be compared because the contractors bid different scopes. Our bid coordination service structures the process so the bids are actually comparable - same scope, same documentation requirements, same warranty path - and the award decision is defensible.

The Atlanta commercial roofing market has a structural bid problem. An owner issues a request for proposal, three contractors walk the roof in 20 minutes each, and return numbers that vary by 40 percent. The lowest number wins. Six months into the project, the lowest-bid contractor requests change orders for items that were obvious on the roof walk - wet insulation that needed replacement, a deck section that needed remediation, a drain that needed a new bowl. The final cost of the lowest bid is often higher than the second-place bid would have been.

We run bid coordination as a structured service: develop the scope of work from a documented roof condition assessment, define the specification to a level that eliminates contractor interpretation gaps, issue the bid package to a qualified contractor list, level the returned bids line-by-line against the specification, and produce a written award recommendation that the owner can present to a board, a capital committee, or an institutional owner's asset manager. This is not project management - it is owner-side procurement support for the bid process itself.

Atlanta's 1990s and 2000s suburban office reroof cycle is generating more competitive bid situations than the market has seen in two decades. Perimeter Center, Sandy Springs, Dunwoody, and the Cobb Galleria corridor are all moving through large replacement cycles simultaneously. Property managers and asset managers handling multiple buildings in these corridors are running bid processes back-to-back. A structured approach to each bid reduces the time the asset manager spends on each process and increases the quality of the award decision.

Scope of work: Detailed specification covering the existing system tear-off (or recover, if that is the scope), insulation specification to Georgia energy code (IECC 2021, minimum R-25 for low-slope commercial), membrane type and thickness, attachment method, fastener pattern per IBC 2021 wind-uplift requirements for the building's exposure category, drain work, flashing details, penetration details, and walkway pad locations. The specification is specific enough that contractors cannot substitute materials without written approval - a gap that undermines most informal bid processes.

Contractor qualification requirements: Certificate of insurance at required coverage limits (we specify based on project size - typically $2M commercial general liability minimum, with umbrella limits scaled to project scope), workers' compensation verification, references from three comparable Atlanta-market commercial projects in the last five years, manufacturer training documentation for the specified membrane system, and acknowledgment that the warranty closeout requirements are a contract deliverable, not optional.

Bid form: Line-item format that breaks labor, material, and warranty cost separately, forces itemization of insulation scope, requires unit pricing for potential change order scenarios (additional deck remediation, additional wet insulation, additional drain replacement) at predefined unit rates, and requires acknowledgment of the spec documentation. When bids come back on a uniform form, comparison is mechanical rather than interpretive.

How this roof scope moves.

We keep the sequence clear so owners, managers, and facility teams know what happens next.

Document

Confirm roof access, active symptoms, membrane condition, drainage, penetrations, edge details, and visible moisture indicators.

Scope

Separate immediate repair needs from recover, coating, replacement, warranty, or capital planning recommendations.

Execute

Coordinate crew timing, tenant impact, material path, safety setup, closeout photos, and any warranty-related documentation.

Need this reviewed on your building?

Send the roof location, photos, tenant schedule, and timing. We will route it to the right commercial roof scope.